By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Notification
yourcryptonewstoday yourcryptonewstoday
  • Home
  • News
    • Crypto Bubbles
    • Regulations
    • Metaverse
  • MarketCap
  • Altcoins
    • Solana
  • Crypto
    • Bitcoin
    • Ethereum
    • Cardano
  • Blockchain
  • Market
    • Nft
  • Mining
  • Exchange
  • Analysis
    • Evaluation
    • Multi Currency
Reading: SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout
Share
bitcoin
Bitcoin (BTC) $ 58,590.00
ethereum
Ethereum (ETH) $ 1,644.28
tether
Tether (USDT) $ 0.998949
bnb
BNB (BNB) $ 539.10
usd-coin
USDC (USDC) $ 0.999486
xrp
XRP (XRP) $ 0.905158
binance-usd
BUSD (BUSD) $ 0.999758
dogecoin
Dogecoin (DOGE) $ 0.053509
cardano
Cardano (ADA) $ 0.139452
solana
Solana (SOL) $ 67.75
polkadot
Polkadot (DOT) $ 0.632603
tron
TRON (TRX) $ 0.307487
Your Crypto News TodayYour Crypto News Today
  • Home
  • News
  • MarketCap
  • Altcoins
  • Crypto
  • Blockchain
  • Market
  • Mining
  • Exchange
  • Analysis
Search
  • Home
  • News
    • Crypto Bubbles
    • Regulations
    • Metaverse
  • MarketCap
  • Altcoins
    • Solana
  • Crypto
    • Bitcoin
    • Ethereum
    • Cardano
  • Blockchain
  • Market
    • Nft
  • Mining
  • Exchange
  • Analysis
    • Evaluation
    • Multi Currency
© 2024 All Rights reserved | Protected by Your Cryptonews Today
Your Crypto News Today > Mining > SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout
Mining

SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout

March 22, 2026 2 Min Read
Share
image

SoftBank is planning to construct an enormous AI information heart advanced in Ohio able to drawing as much as 10 gigawatts of energy, in accordance with a Bloomberg report.

The ability can be developed on federally owned land at a former uranium enrichment web site, with the primary part anticipated to ship about 800 megawatts of capability by early 2028 at a price of $30 billion to $40 billion, making it one of many largest computing hubs globally.

To help the buildout, SoftBank is backing roughly $33 billion in pure fuel energy infrastructure, with generators already sourced and anticipated to be deployed throughout the area via the tip of the last decade. The entire deliberate technology capability of about 9.2 gigawatts would rival a few of the largest energy initiatives within the US.

The size displays the surge in demand for AI infrastructure, as hyperscalers and governments race to safe compute and vitality capability. A ten-gigawatt information heart would eat energy corresponding to hundreds of thousands of properties, placing stress on grids already struggling to maintain up with AI-driven demand.

The venture is tied to a broader $550 billion US-Japan funding framework that features vitality and industrial infrastructure, and comes as policymakers push to safe home capability within the international AI race.

SoftBank has not but disclosed clients for the location, however mentioned companions will likely be concerned in sourcing chips and gear. The corporate is working with native utilities to improve transmission infrastructure, with about $4.2 billion earmarked for grid growth.

The proposal additionally highlights rising rigidity round AI vitality use. Information heart growth has triggered backlash in elements of the US over rising electrical energy and water demand, at the same time as governments prioritize constructing out capability to compete with China in superior applied sciences.

Disclosure: This text was edited by Estefano Gomez. For extra info on how we create and evaluation content material, see our Editorial Coverage.

You Might Also Like

GameStop shares jumps after Michael Burry revealed he’s been buying

Justiin Sun dismisses ‘made up’ HTX address poisoning rumors

World War III threatens Bitcoin mining infrastructure

Pulsar Money Streamlines Web3 Payments Workflow With 50x Faster Verification

Vertex Ventures investment backs dtcpay funding as firm targets European stablecoin payment expansion

TAGGED:MiningMining NewsNews
Share This Article
Facebook Twitter Copy Link
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

South Korean Exchanges Upbit and Bithumb Issued a Warning Regarding an Altcoin
South Korean Exchanges Upbit and Bithumb Issued a Warning Regarding an Altcoin
Are NFTs Making a Return to Auction Houses?
Are NFTs Making a Return to Auction Houses?
Bitcoin miners' profits decline for the fourth consecutive month
Bitcoin miners’ profits decline for the fourth consecutive month
German tradFi giants confirm trial to mine Bitcoin with surplus energy to stabilize grid
German tradFi giants confirm trial to mine Bitcoin with surplus energy to stabilize grid
Bitcoin Not a Threat to US Dollar, Donald Trump Asserts
Bitcoin Not a Threat to US Dollar, Donald Trump Asserts
Bitcoin Mining Costs Soar as Miners Expect Long-Term Price Boosts
Bitcoin Mining Costs Soar as Miners Expect Long-Term Price Boosts

You Might Also Like

ProShares Launches Leveraged Solana and XRP ETFs Following NYSE Arca Approval
Exchange

ProShares Launches Leveraged Solana and XRP ETFs Following NYSE Arca Approval

July 15, 2025
BTC mining stocks fall from 2026 peaks amid booming AI narrative
Mining

BTC mining stocks fall from 2026 peaks amid booming AI narrative

October 8, 2026
image
Mining

FutureBit launches Apollo III, U.S.-Engineered Home Bitcoin Miner

February 19, 2026
WazirX Rebalancing Calculator shows users missing out on Bitcoin’s $81K all-time high
Exchange

WazirX Rebalancing Calculator shows users missing out on Bitcoin’s $81K all-time high

November 12, 2024
yourcryptonewstoday yourcryptonewstoday
yourcryptonewstoday yourcryptonewstoday

"In the fast-paced world of digital finance, staying informed is essential, and we’re here to help you navigate the evolving landscape of crypto currencies, blockchain, & digital assets."

Editor Choice

China’s internet regulator launches unified filing system for AI and blockchain
Crypto exchange BitMart weighs partial restart and creditor payouts weeks after announcing shutdown
RWA Market Caps $24B With 85% YoY Growth as Tokenization Goes Mainstream

Subscribe

* indicates required
/* real people should not fill this in and expect good things - do not remove this or risk form bot signups */

Intuit Mailchimp

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Twitter Linkedin Facebook
  • About Us
  • Contact Us
  • Disclaimer
  • Terms of Service
  • Privacy Policy
Reading: SoftBank plans 10-gigawatt AI data center in Ohio powered by $33 billion gas buildout
Share
Follow US
© 2025 All Rights reserved | Protected by Your Crypto News Today
Welcome Back!

Sign in to your account

Lost your password?